You might know this as joint sealant. Same work, either name. We replace failed exterior joint sealant on commercial buildings — precast and panel joints, window perimeters and expansion joints. This is the work that keeps water out of the wall before it reaches anything expensive inside.

What we do

Joint survey and testing

Elevations walked or dropped, joint types and widths recorded, and adhesion pull tests done on the existing sealant. This determines which joints are failing and what the replacement product has to bond to.

Full removal of old sealant

Existing sealant cut out to the substrate on both faces and the joint cleaned. Residue left behind is the most common cause of a new sealant failing early.

Backer rod and bond breaker

Closed-cell or open-cell rod installed to set joint depth and prevent the sealant bonding to the back of the joint. Bond breaker tape used where the joint is too shallow for rod.

Priming and sealant installation

Substrate primed where the manufacturer requires it, then sealant gunned and tooled in one pass to full contact on both faces at the specified width-to-depth ratio.

Adhesion mock-up and field testing

A test section installed and pull-tested before the full run, then spot tests during the work. This is standard on specified projects and worth requesting on any large elevation.

Water testing and leak tracing

Spray testing suspect areas to confirm the leak path before and after work. Necessary when the complaint is an interior leak rather than visibly failed joints.

What the warning signs mean

If you are seeing any of this, call us before it gets more expensive.

What you are seeingWhat it usually means
Sealant pulled cleanly off one joint faceAdhesion failure; usually bad prep or missing primer
Sealant split down the middle of the jointCohesive failure; product movement capability was too low
Dark staining running below joints on stonePlasticizer migration from the wrong silicone formulation
Interior stains at window heads after wind-driven rainPerimeter seal breached above; water is traveling before showing

How the job runs

Survey and product selection

Joints inspected and measured, substrates identified, and adhesion tested. Product is selected for movement capability and substrate compatibility, not for what is on the truck.

Mock-up and approval

A sample run installed, cured, and hand pull-tested to confirm adhesion and primer requirements. Color is approved against the wall in daylight since cured color differs from the tube.

Access setup and protection

Lift, stage, or rope access rigged, and sidewalks, glass, and landscaping protected. Tenants near the work get notice, particularly where windows must stay closed.

Cut out and clean

Old sealant removed to sound substrate on both faces, joints cleaned by grinding or a two-cloth solvent wipe, and dust blown out. Joints are sealed the same day they are prepped.

Rod, prime, gun, and tool

Backer rod set to depth, primer applied where required, sealant gunned and tooled to full contact on both joint faces. Tooling is what forces the hourglass profile that lets the joint move.

Cure, test, and close out

Sealant cures for the product's stated period, then spot adhesion checks and any water testing. Close-out should include product data sheets, warranty documents, and a marked-up elevation of what was replaced.